Case Study – ICF Bracing for Toowoomba Bridge Construction
This case study examines the successful use of Eco Block, a high-performance product used for bridge construction and upgrades to a Toowoomba causeway. The ICF (insulated concrete form) bracing, was initially chosen for its strength and durability. However, Eco Block ICF, in particular, was opted for due to its proximity to the project location and…